Modernising a Strategic Rail Connection in Western Portugal
A broad multidisciplinary intervention was required to address both the railway itself and the infrastructure surrounding it. The project includes electrification and catenary design, signalling, drainage, earthworks and the duplication of approximately 16 km of track, alongside the removal of 14 level crossings through new overpasses. The scope also covers the widening of six engineering structures, two new railway structures, retaining structures, slope stabilisation, tunnel rehabilitation, road reinstatements, station alterations, substations, affected utilities, fencing and expropriations. Quadrante’s engineering work focused on hydrology, platform drainage, railway and road structures, retaining structures, tunnel rehabilitation, road reinstatements, fencing and expropriations.
Market
Sector
Mobility
Services
Location
Portugal
Year
2017
Status
Concluded
Client
Infraestruturas de Portugal
Intervention length
87 km
Track duplication
16 km
Level crossings removed
14
Structures widened
6
New railway structures
2