Transforming Urban Mobility in Maputo
Designing the BRT corridor within Maputo’s existing urban fabric required the coordinated development of transport, road, building and supporting infrastructure. Quadrante was responsible for the coordination and delivery of the Preliminary, Basic and Detailed Design stages, covering the disciplines associated with the road infrastructure, 16 stations, four terminals and a parking and maintenance depot. The multidisciplinary scope addressed both the BRT alignment and the buildings and infrastructure required for its operation.
Market
Sector
Mobility
Services
Location
Maputo, Mozambique
Year
2016
Status
Concluído
Client
Odebrecht
Total length
16,5 km
Stations
16
Terminals
4