Engineering Barcelona’s Metro Above and Below Ground
Combining underground and elevated infrastructure, the Detailed Design and Environmental Impact Study developed by Meta Engineering, now operating as Quadrante Global , addressed the diverse technical conditions along Section 2N. The alignment includes approximately 5.87 km of tunnel excavated using a 12.06 m diameter TBM, 1.47 km using a 9.40 m TBM, 1.86 km of cut-and-cover tunnel, 469 m of mined tunnel and 2.7 km of elevated double track on viaduct. The project also comprises eight shaft-type stations with a diameter of 26 m, three elevated stations approximately 129 m long, and a new workshop and depot complex with 4.3 km of railway tracks and capacity for 20 trains.
Market
Sector
Mobility
Location
Barcelona, Spain
Client
Gestió d’Infraestructures, S.A. (GISA)