Searching...
Engineering the Structures Behind Automotive Production
The assignment included preliminary structural design for 14 buildings, representing approximately 47,000 m² of covered area, and detailed structural design for the paint shop building. The latter covered approximately 17,500 m² and incorporated precast concrete columns founded on piles, with a steel roof structure.
Market
Sector
Energy
Services
Location
Estado do Rio de Janeiro, Brazil
Year
2011–2012