Searching...
Engineering the Infrastructure Behind Lisbon’s New Hospital
The hospital will initially provide 875 beds, with the infrastructure designed to accommodate up to 1,075 beds in contingency situations without additional construction work. The development includes underground and above-ground connections between buildings, a heliport and 2,945 parking spaces, at least 1,450 of which will be underground. Quadrante’s multidisciplinary engineering scope covers structures and foundations, water supply and fire protection, wastewater and stormwater drainage, gas, electrical and telecommunications networks, road infrastructure and external works, earthworks, traffic consultancy and acoustics, as well as the heliport.
Market
Sector
Sustainable Cities
Services
Location
Lisbon, Portugal
Status
Ongoing
Client
Mota-Engil
Gross area
180 000 m²
Buildings
3 edifícios interligados
Initial capacity
875 camas
Contingency capacity
1 075 camas