Boosting the Wind to drive the Energy Transition
Access, platforms, cable trenches and power lines were built to ensure the assembly and connection of 11 wind turbines, equivalent to the installation of 49.5 MW of 100% renewable energy, thereby reducing dependence on fossil fuels and cutting greenhouse gas emissions.
Total power
45 MW
Cable trenches
12 km
Airline
2,4 km