Two large-scale battery installations required detailed engineering tailored to the different grid conditions of Menorca and Ibiza. Izharia, now operating as Quadrante Global, developed the engineering for both BESS installations and their integration with the existing electricity infrastructure. In Menorca, the system is located adjacent to the 132 kV Es Mercadal substation and provides 50 MW of power and 37.5 MWh of storage capacity. In Ibiza, the BESS connected to the 66 kV San Antonio substation provides 90 MW and 67.5 MWh. Both interconnections include nearby Red Eléctrica de España (REE) substations and modular operation and maintenance buildings.