Searching...
Reinforcing Chile's Transmission System
The project consisted of the construction of a new 2×500-kV transmission line, between the Parinas substation and the Likanantai Substation, with a capacity of 1700 MVA. It presented huge technical challenges, given the project location’s difficult access and high altitude, between 2,000-3,400 m.
Services
M-HV power lines
133 km
Consisting of 319 supports
500 kV
M-HV power lines
40 km
Consisting of 100 supports
220 kV